Solar charge and discharge controller: X series of instructions
A brief introduction to separate work parts
1: controller host work independently: work parameters for factory settings (original parameters), if you need to change the parameters, you need to connect the control panel (display board)
2: control board (display board), can be separated work, but can not work independently, the need to connect the host computer network controller, read the model, you can work normally.
3:The green and yellow indicator lights at the interface of the C: controller: the green light is always on, indicating that the system works normally, the green light flashes, indicating that the load is working, and the yellow light is always on,
This means that the solar panel is connected, and the yellow light flashes, indicating that the charge is being charged.
4: control board (display board) separation work, transmission speed: 9600bit, the maximum support distance of 1000 meters
The communication interface is the universal network interface; the host and the display board work separately, need the connection to be able to work normally;(Note that the native network interface is only suitable for the products of our company and is not compatible with other manufacturers' products)